What should an architectural acoustic consulting firm do? This question is very commonly asked when an acoustician is asked to submit a work proposal for a project. In this article, we will describe the scope of work of an acoustic consultant with reference to the type of mixed-use high-end building project. Because in this type of project an architectural acoustic consultant is required to be able to describe all the scope of work in one project with high complexity.

Details of the scope of work of acoustic consultants in mixed-use high-end building projects are as follows:

1. Criteria Formulation
At the beginning of the project, the acoustic consultant must recommend design criteria/targets for various rooms and areas within the building such as retail, apartment units both for bedrooms and living rooms, and commercial areas such as meeting rooms, multifunction rooms, spas, fitness, restaurants. , club lounges, etc. These criteria are determined based on studies and summaries of the applicable standards in the country, international standards, client recommendations, and the building operator concerned.

2. Schematic
With so many rooms that fall into the scope of work of an acoustic consultant with this type of project, it is highly recommended that an acoustician provide schematic designs for several important rooms for the attention of other consultants in the early stages of the project. Examples are MEP rooms, building structure connections, placement of HVAC equipment above the ceiling, and draft wall partition configurations.

3. Noise Review from the Environment Around the Building
The acoustic consultant must review potential sources of noise from aircraft, train stations, transportation on highways, outdoor MEP equipment, and all things around the building that have the potential to interfere with audial comfort to the interior of the building to ensure the targeted acoustic criteria are achieved. At this stage the acoustician must be able to convey the results of modeling and simulations for several points around the building in the form of drawings that can be understood by clients and other consultants. At this stage, a building fa konfigurasiade configuration can be recommended that takes into account the noise from the area around the building.

4. Noise HVAC (duct-borne)
Discussion and review of noise from all HVAC be it from air handling unit (AHU), axial and centrifugal fans, fan coil unit (FCU), etc. The ducting system will be analyzed to determine the noise level in the critical room from the nearest diffuser ducting system outlet. From this analysis, the need for silencers, lagging or duct linings will be recommended in order to achieve the acoustic criteria that have been determined. The analysis will be carried out on all HVAC systems without exception, with the greatest attention being on residential areas, spas, hotels, etc.

5. Sound Propagation in Building Structures (Structure-Borne)
All matters relating to the propagation or vibration of sound via the building structure, whether it is due to human footsteps on the top floor or vibrations from the installation of MEP machines above the ceiling or floor. The acoustic consultant must be able to evaluate according to the natural frequency of the building structure and provide recommendations on floor slab elements to meet operator and client standards applied.

6. Machine Vibration Control
The acoustic consultant should conduct an in-depth discussion on the vibration isolator for the installed machines. This is done by taking into account the deflection of the floor slab and its relationship to the static and dynamic loads of the machine (eg chiller, pump, cooling tower, AHU, etc.). In addition, ensuring the insulator is efficient to withstand vibrations to the building structure.

7. Room Insulation
Discussion on the isolation of certain rooms by providing technical calculations both with the “indoor room” and “floating floor” methods so that sound and vibration do not propagate to all elements of the building, especially the room around the isolated area.

8. Acoustic Interior
Reviewing and calculating room acoustic parameters on interior design elements of commercial spaces such as ballrooms, meeting rooms, and other areas where the clarity of speech or music is crucial.

9. Detailed Drawing
The acoustic consultant must provide or recommend specifications for building skin elements such as faades, walls and floor slabs in CAD format on a cut or plan basis. This will make it easier for relevant consultants to apply these specifications in their construction drawings.

10. Noise Isolation Due to Impact
Collisions in the fitness area, whether it’s due to aerobic activity or lifting weights, are a special concern for acoustic consultants. In addition to different forms of acoustic treatment, the time span of these activities must also be included in detailed technical calculations, and of course measurable.

11. Review of Related Consultant Drawings
After all acoustic treatments have been adapted to construction drawings by the relevant consultant, the acoustician must review all these drawings to ensure that all treatments have been described correctly, before entering the tender phase.

12. Coordination with Selected Contractors
The acoustic consultant must allocate time to coordinate the design and answer questions from the selected contractor and sign all forms related to material approval if it is in accordance with the acoustic intentions.

13. Final assessment
Before handing over the project to the next party, the acoustic consultant must conduct a final assessment of the building elements designed by the consultant. Next, compare the measured value to the design target and pre-determined criteria.

by Ramadhan Akmal Putra 

Hizkia

Recent Posts

10 km of new MRT noise barriers in Ang Mo Kio, Buona Vista completed

SINGAPORE - Residents in Ang Mo Kio, Bukit Batok and Buona Vista are now enjoying…

3 tahun ago

Shah Alam, Residents affected by noise want highway sound barrier restored

Residents of Pinggiran Golf Saujana Resort in Shah Alam, Selangor, have been living with noise…

3 tahun ago

Royal Thai Airforce training to move due to noise complaints

Udon Thani: Relief measures including a plan to move a training base for the Thai…

4 tahun ago

Singapore: Woman who suffered through noise from upstairs neighbors lost sleep, job

After tolerating what she claimed were sounds of dragging furniture and children running and jumping…

4 tahun ago

Korea: Residents of Pyeongtaek to Receive Compensation for Military Noise Pollution

PYEONGTAEK, Jan. 3 (Korea Bizwire) About 63,000 residents of Pyeongtaek will receive monthly compensation for…

4 tahun ago

George Town Malaysia: Factory buses causing noise, complain residents

Factory buses causing noise, complain residentsGEORGE TOWN: Residents in the Relau neighbourhood in Paya Terubong,…

4 tahun ago

This website uses cookies.